A heat-welded seam turns two rolls into one continuous sheet. Done well, the weld rod fuses with both sheet edges and the joint is as strong and as cleanable as the body of the floor. Done badly, the seam is where dirt lodges, where disinfectant pools, and where the floor starts to fail.
Three settings do most of the work. Groove depth: the router must reach the sheet body but not cut through the backing — about two-thirds of sheet thickness. Nozzle temperature: set for the rod material, usually around 350–400 °C for PVC rod, and constant along the weld. Speed: slow enough for full fusion, fast enough to avoid scorching — a well-made weld shows a small, even bead on both edges that trims off in two passes.
Test the weld before moving on: nick the cooled seam and pull. A good weld tears the sheet, not the joint. If it opens cleanly along the weld line, re-weld that section — no exceptions in hygiene-critical areas.






